
We added a warehouse bay to an operating industrial building in Mississauga.



The building had to stay in operation while the new bay went up, and its overhead crane had to reach into the addition.
We sequenced the foundations, steel frame, crane extension and envelope around daily operations. The addition is enclosed in insulated precast panels with a one-hour fire-resistance rating under an R-35 roof. Site work included docks, paving and relocating site infrastructure, including solar equipment.
The owner gained more warehouse space served by the crane already in use, in a durable, fire-rated and well-insulated shell.








