16728 Highway 12

16728 Highway 12

Self-storage facility
Sector
Industrial
Status
Currently Building
Delivery model
General Contracting
Location
Midland
During the work
Duration

We are building a three-storey self-storage facility and a separate 20,000 sq ft three-bay building on a 5.5-acre site in Midland, delivering both buildings and the site works around them.

Before, during and after

16728 Highway 12
Before
16728 Highway 12
During
16728 Highway 12
After
Case study

How it came together

The challenge

How we did it

The result

Gallery

Get in touch

Let's talk about your project

Request a proposal