We built an addition to an active warehouse and distribution facility in Vaughan and tied it into the existing building.



The facility had to keep running while the addition went up and connected to the existing building. Partway through, the ground under the addition proved weaker than expected.
We sequenced the work around daily operations and planned every tie-in to the existing building: roofing, racking, electrical, sprinklers and the fire department connection. When the subgrade problem surfaced, we brought in a specialized remediation approach to stabilize the site without stopping construction.
The owner gained added capacity and new loading docks that work as one building with the original, without ever shutting the facility down. Work finished in July 2026.